logo
  • English
Home ProductsWindbreak Panel

Construction Site Windbreak And Dust Suppression Wall With Round Hole

I'm Online Chat Now

Construction Site Windbreak And Dust Suppression Wall With Round Hole

Construction Site Windbreak And Dust Suppression Wall With Round Hole
Construction Site Windbreak And Dust Suppression Wall With Round Hole

Large Image :  Construction Site Windbreak And Dust Suppression Wall With Round Hole

Product Details:
Place of Origin: China
Brand Name: Jing Chuang
Payment & Shipping Terms:
Price: negotiation
Packaging Details: Plastic film and Wooden case, then put them in pallet
Delivery Time: With 15-30 work days
Payment Terms: L/C, D/A
Supply Ability: 1000 Piece/Pieces per Week

Construction Site Windbreak And Dust Suppression Wall With Round Hole

Description
Name: Windbreak And Dust Suppression Wall Application: Coal Yard Highway
Aperture: 10mm Hole Type: Round Hole
Highlight:

Construction Site Dust Suppression Wall

,

Windbreak And Dust Suppression Wall

Construction Site Wind And Dust Suppression Wall

 

Wind dust-controlling installation instructions:

1 wind dust-controlling nets underground foundation: a precast concrete block or in situ underground foundation.

2. Wind-proof and dust suppression mesh support structure: The engineering design is based on the design parameters of wind speed. Steel support is adopted. The support mainly provides enough strength for the "windshield and dust suppression wall" to resist the damage of strong wind, followed by the overall aesthetics. The main body of the bracket is steel tube, and the reinforced concrete pillar is used as the bracket of "windshield and dust suppression wall".

3. Installation of windshield plate: 15-20 years of service life. Use ambient temperature: -40℃ to +80℃, the connection is fixed by screws and platen. The specific size, bending degree and opening rate of the windshield damper should be designed according to the actual situation of the yard.

4. Retaining brick wall: 1.2-1.5m retaining brick wall can be set at the lower part of the retaining wall to prevent slime water from spilling after rain and snow.

Contact Details
Hebei Jingchuang FRP Co., Ltd.

Contact Person: Yin

Tel: 15127816101

Send your inquiry directly to us (0 / 3000)